Total Commissioning (Cx)
Solution Provider

We redefine Commissioning. It's not just a test at the end; it's a quality assurance process from Design to Operations.

The Cx Lifecycle Approach

Ensuring "IT-Ready" status at every stage of the project.

01

Design Phase Cx

  • OCP/ASHRAE Review: Validate cooling topology against NVL72 specs.
  • CFD Modeling: Predict thermal hotspots before construction.
  • TCO Analysis: CAPEX/OPEX optimization for liquid cooling.
02

Construction Cx

  • Factory Acceptance (FAT): Pre-testing CDUs and Manifolds at the factory.
  • Cleanliness Control: Ensuring pipework meets ISO 4406 standards for particulates.
  • Pressure Testing: Validating loop integrity under 1.5x operating pressure.
03

IST & Handover

  • Blackout Test: Full load switching using DCI-HLC-72 emulators.
  • Transient Response: Verifying generator step-load capability.
  • O&M Training: Handing over not just keys, but knowledge.

Adhering to Global Standards

ASHRAE TC 9.9
Thermal Guidelines
Uptime Tier IV
Topology Standard
LEED Gold
Energy Efficiency
OCP ORv3
Open Rack Standard